Rail Case Studies

RJPower-CastleOak

Gospel Oak to Barking Electrification

RJ Power Rail has provided works to support Network Rail’s Gospel Oak to West Barking Electrification scheme, a rail programme to upgrade the existing rail freight and passenger train lines from diesel to traction power via the installation of new

View Project
ep-case-study-feat

E&P CP5 S&C South Alliance

RJ Power Group have successfully completed a number of ETE Projects in Kent, Sussex and Wessex on behalf of Colas Rail. The projects which formed part of Colas Rail’s S&C Framework on Network Rail’s Southern area, allowed RJ Power Group

View Project
RJPowerWilliamsWayFinalProjectStudy-2

Thameslink F425 – Williams Way Depot Substation

The Summer of 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley. RJ Power Group provided the most compelling offer, successfully secured the contract working on behalf of UK

View Project
C138424-Power-Supply-Enhancement-(PSE)-Phase-3

C138424 Power Supply Enhancement (PSE) Phase 3

RJ Power Group, having successfully completed Phase 2 of the Power Supply Upgrade Project for their client BCM Construction Ltd, negotiated Phase 3 of the project to Install, Test and Commission new 650v High Voltage (HV) feeder supplies including all

View Project
RJPower-Casestudy_ThreeBridges-2

C10656 Thameslink Depot Three Bridges

Summer 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley, one of the two depots being built for Siemens. RJ Power Group fought off stiff competition, to secure the

View Project
07-12-15-239

C138424 Power Supply Extension (PSE) Phase 2 – Plumstead Sidings

RJ Power Group, having successfully completed previous works for Phase 1 of the Power Supply Upgrade Project for their client BCM Construction Ltd, were awarded Phase 2 of the project to Install, Test and Commission new High Voltage (HV) feeder

View Project

GET IN TOUCH

RJ Power Group Limited
The Graylands Estate,
Unit 20,
Langhurst Park,
Langhurst Wood,
Horsham
RH12 4QD
0345 034 1480
Connect with us online





© RJ Power Group Ltd All Rights Reserved 2016

ukas iso-18001 risqs-audited risqs-qualifiednic rospasafecontractor constructionline