RJ Power Rail has completed its electrical and mechanical decommissioning contract works on behalf of Principal Contractor Colas Rail, for the Stage 2 and 3 decommissioning of Old Oak Common Depot. The scope also included civil engineering activities such as...
View ProjectRJ Power Rail were engaged by long-term partner Amey Rail and their Thames Valley Area (TVA) Project team, to install earthing and bonding systems for various trackside assets. The bonding systems were required to enhance the system protection by providing...
View ProjectThis DC cable renewal project involved the installation, testing and commissioning of new DC Cables which was derived from the DC Cable Refurbishment Woking – Basingstoke Route Requirements Document issued by Network Rail (NR). RJ Power Rail were invited to...
View ProjectRJ Power Rail (RJPR) has successfully installed, tested and commissioned a Technivel panel, which included providing a design for re-routing the cables, for this LVAC panel at Streatham substation on behalf of Network Rail (NR). The rail team provided a...
View ProjectThe Redhill Platform Development Project was intended to develop a number of complimentary enhancements that, together, allow additional splitting/jointing of services at Redhill and provide additional resilience to facilitate operation of the proposed post-Thameslink K02 timetable. In order to create...
View ProjectAs part of a five-year framework on behalf of Network Rail Infrastructure Projects (NR), to deliver electrification and plant upgrades and renewals in the southern region, RJ Power Rail was awarded a contract for the replacement of HV and Pilot...
View ProjectThe Ilford Yard Stabling Project was a rail infrastructure scheme to provide additional stabling for new Crossrail rolling stock along the north-eastern section of the Crossrail network. The works involved the partial demolition of existing facilities at Ilford Depot to...
View ProjectRJ Power Rail has provided works to support Network Rail’s Gospel Oak to West Barking Electrification scheme, a rail programme to upgrade the existing rail freight and passenger train lines from diesel to traction power via the installation of new...
View ProjectRJ Power Group have successfully completed a number of ETE Projects in Kent, Sussex and Wessex on behalf of Colas Rail. The projects which formed part of Colas Rail’s S&C Framework on Network Rail’s Southern area, allowed RJ Power Group...
View ProjectThe Summer of 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley. RJ Power Group provided the most compelling offer, successfully secured the contract working on behalf of UK...
View ProjectRJ Power Group, having successfully completed Phase 2 of the Power Supply Upgrade Project for their client BCM Construction Ltd, negotiated Phase 3 of the project to Install, Test and Commission new 650v High Voltage (HV) feeder supplies including all...
View ProjectSummer 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley, one of the two depots being built for Siemens. RJ Power Group fought off stiff competition, to secure the...
View ProjectRJ Power Group, having successfully completed previous works for Phase 1 of the Power Supply Upgrade Project for their client BCM Construction Ltd, were awarded Phase 2 of the project to Install, Test and Commission new High Voltage (HV) feeder...
View Project