Case Studies

Network Rail Sussex Renewals

The Redhill Platform Development Project was intended to develop a number of complimentary enhancements that, together, allow additional splitting/jointing of services at Redhill and provide additional resilience to facilitate operation of the proposed post-Thameslink K02 timetable. In order to create...

View Project

Replacement of LV equipment

RJ Power Networks carried out the safe removal, disposal and recycling of all the old equipment and then installed, tested and commissioned a new LV panel, power factor correction panel, battery tripping unit, remote generator connector panel and all containment...

View Project

CP5 HV Feeder Renewals Kent Route

As part of a five-year framework on behalf of Network Rail Infrastructure Projects (NR), to deliver electrification and plant upgrades and renewals in the southern region, RJ Power Rail was awarded a contract for the replacement of HV and Pilot...

View Project
Ilford Depot

Ilford Depot

The Ilford Yard Stabling Project was a rail infrastructure scheme to provide additional stabling for new Crossrail rolling stock along the north-eastern section of the Crossrail network. The works involved the partial demolition of existing facilities at Ilford Depot to...

View Project

Gospel Oak to Barking Electrification

RJ Power Rail has provided works to support Network Rail’s Gospel Oak to West Barking Electrification scheme, a rail programme to upgrade the existing rail freight and passenger train lines from diesel to traction power via the installation of new...

View Project

E&P CP5 S&C South Alliance

RJ Power Group have successfully completed a number of ETE Projects in Kent, Sussex and Wessex on behalf of Colas Rail. The projects which formed part of Colas Rail’s S&C Framework on Network Rail’s Southern area, allowed RJ Power Group...

View Project

Thameslink F425 – Williams Way Depot Substation

The Summer of 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley. RJ Power Group provided the most compelling offer, successfully secured the contract working on behalf of UK...

View Project

C138424 Power Supply Enhancement (PSE) Phase 3

RJ Power Group, having successfully completed Phase 2 of the Power Supply Upgrade Project for their client BCM Construction Ltd, negotiated Phase 3 of the project to Install, Test and Commission new 650v High Voltage (HV) feeder supplies including all...

View Project

C10656 Thameslink Depot Three Bridges

Summer 2015 saw the arrival of the first of the new trains into the purpose built Three Bridges Depot at Crawley, one of the two depots being built for Siemens. RJ Power Group fought off stiff competition, to secure the...

View Project

C138424 Power Supply Extension (PSE) Phase 2 – Plumstead Sidings

RJ Power Group, having successfully completed previous works for Phase 1 of the Power Supply Upgrade Project for their client BCM Construction Ltd, were awarded Phase 2 of the project to Install, Test and Commission new High Voltage (HV) feeder...

View Project

GET IN TOUCH

RJ Power Group Limited
The Graylands Estate,
Unit 20,
Langhurst Park,
Langhurst Wood,
Horsham
RH12 4QD
0345 034 1480
Connect with us online





Yes I would like to receive communications by email

Before you proceed please tick to state you have read and agreed to our Privacy & Cookie Policy

©

ukasiso-14001iso-18001risqs-auditedrisqs-qualifiednicrospasafecontractorconstructionlineuvdb